Skip Ribbon Commands
Skip to main content

Skip Navigation LinksAeronautical Information Publications Supplements

Last Updated 10th April 2017.

Temporary changes of long duration (three months or longer) and information of short duration which contains extensive text or graphics supplementing the permenant information contained in AIP.

NR

NR / YEAR

TITLE OF AIP SUPPLEMENTS

​1​01 / 2017
AIRFIELD PAVEMENT REHABILITATION WORKS SCHEDULE

2

 01 / 2014  

NR 1 - ANDUKI - OFFSHORE PLATFORM

3

02 / 2014

CHECKLIST OF AIP SUPPLEMENT

4

06 / 2013

BRUNEI AIRSPACE RESTRICTIONS FOR BRIDEX 2013 AIR DISPLAY

5

05 / 2013

BRUNEI TMA TEMPORARY RESTRICTIONS (REF BRUNEI AIP : ENR 1.10, ENR 5.1)

6

04 / 2013

BRUNEI INTERNATIONAL AIRPORT PARKING STAND 1 CLOSED

7

03 / 2013

CHANGES AND ADDITIONAL INFORMATION IN AIP BRUNEI

8

01-02 / 2013

NR 1 - ANDUKI - OFFSHORE PLATFORM

NR 2 - ANDUKI - OFFSHORE PLATFORM

9

05 / 2012

TOWER CRANE MODERNIZATION OF BRUNEI INTERNATIONAL AIRPORT TERMINAL

10

04 / 2012

ANDUKI HELIPORT

11

01-03 / 2012

NR 1 - STOP BAR AND LEAD ON LIGHTS

NR 2 - CRANE

NR 3 - CRANE

12

09 / 2011

ANDUKI FREQUENCIES

13

07-08 / 2011

NR 7 - STOP BAR AND LEAD ON LIGHTS

NR 8 - SAFEGATE DOCKING SYSTEM

14

06 / 2011

CORRIGENDA

15

05 / 2011

BRUNEI AIRSPACE RESTRICTIONS FOR BRIDEX 2011 AIR DISPLAY

16

04 / 2011

RE-DESIGNATION OF TAXING LEAD LINES OF STAND 5,6,7 AND 8

17

03 / 2011

RESCUE AND FIRE FIGHTING SERVICES

18

02 / 2011

CHANGES AND ADDITIONAL INFORMATION IN AIP BRUNEI

19

01 / 2011

SUNRISE AND SUNSET FOR YEARS 2011 UNTIL 2015.pdf

20

04-05 / 2010

NR 4 - ANDUKI HELIPAD - OPERATION OF HELIPAD

NR 5 - ANDUKI HELIPAD - AERODROME CLOSURE

21

03 / 2010

PREVENTATION OF HIGH PATHOGENIC AVIAN UNFLUENZA (HPAI)

22

07 / 2009

ILS RUNWAY 21 OPERATIONAL STATUS

23

03 / 2009

AVGAS 100 COMPLETELY WITHDRAWN

24

02 / 2009

AEROPLANE REQUIRED TO BE EQUIPPED WITH AN AIRBOURNE COLLISION AVOIDANCE SYSTEM (ACAS 11) AND PRESSURE - ALTITUDE REPORTING TRANSPONDER.​

25

02 / 2001

IMPLEMENTATION OF RVSM POLICY AND PROCEDURES

26

01 / 2001

IMPLEMENTATION OF THE REVISE ATS ROUTES STRUCTURE​​